Case Studies

Sector: Utilities Works: • CAT 1 Design and manufacture vehicle bridge• Deliver and Install• Design and build foundations and footings• SEPA Permit• Check structure complied with planning• Topological Survey• Ground Investigations• Steel deck, timber parapets Programme:...
Sector: Public Services Works: Full design, check and build including foundations/bridges and site activitiesProgramme: Planning Permission• EA Consent• Topological Survey• Ground Investigations• Removal of 5nr bridges and causeway• Installation of 3nr replacement bridges•...
Sector: Utilities Works: This contract was for supply and delivery of a 12m x 5m x 44te steel vehicle bridge to a windfarm in the Scottish Highlands, a remote and challenging location. Programme: Off-loading and installation of the bridge was carried out using the suspended...
Sector: Rail Works: As part of the electrification project being undertaken by Network Rail, much of the infrastructure will require alteration to comply with regulations covering distances between structures and live equipment.  Programme: Works were executed during line...
Sector: Railways Works: Removal and disposal of a temporary footbridge as part of the ongoing Crossrail works across London Programme: Client removed and retained all scaffolding, all M&E equipment and temporary lift shafts Setting up site with a 400 Te crane on full...
 The pedestrian bridge had to be removed to allow for a new development. The structure was 60m x 2m and made up of 4 spans. The spans, 13 trestles and approach railings were all removed in one shift.
Contact us
Contact info@beaverbridges.co.uk or call +44 (0)1743 811811 for advice and further information.
Need a bridge?

Contact us to discuss your requirements and find out how we can help

Telephone our specialists on
+44 (0)1743 811811

Contact Us